PRJ-06 / OIL & GAS / PAKISTAN
3,600-Ton Water Storage Tank & Process Piping Fabrication — Hadeed Pakistan

Client
Hadeed Pakistan Ltd.
Location
Pakistan
Industry
Oil & Gas
Year
2018
Project Scope & Details
MHN Engineering fabricated and erected a 3,600-ton raw water storage tank for Hadeed Pakistan, along with the process piping network that feeds the plant. The tank was built on site from steel plate, with full weld inspection and hydrostatic testing before handover.
The piping scope included raw water, steam condensate and RO feed-water lines, plus hydrogen gas and HCL acid storage connections. Each line was routed, welded and tested to suit the specific service and pressure it carries.
The finished system provides Hadeed with reliable bulk water storage and a clean, leak-tight process piping backbone for continuous plant operation.
Key Highlights
- 3,600-ton raw water storage tank fabricated on site
- Raw water, steam condensate and RO feed-water piping
- Hydrogen gas and HCL acid storage piping connections
- Full weld inspection and hydrostatic testing
- Leak-tight process piping for continuous operation
Site Gallery




Related Projects
Need a similar project executed?
Get a Quote