PRJ-12 / AFGHANISTAN / GOVT. / KABUL, AFGHANISTAN
Aviation Fuel Storage & Fuel Operations Building Construction — ANAAC Kabul Airport

Client
Afghan National Army Air Corps (ANAAC)
Location
Kabul International Airport, Afghanistan
Industry
Government / Aviation
Year
2013
Project Scope & Details
MHN Engineering built a complete aviation fuel handling facility at Kabul International Airport for the Air Corps, centred on two 50,000-gallon aviation fuel storage tanks with associated safety systems. The tanks were fabricated to aviation-fuel standards and set on engineered foundations.
The scope extended to a fuel operations building, a pump house for the fuel system and a truck maintenance building with a fuel offload point. Piping, pumps and controls were installed to move fuel safely from delivery to aircraft supply.
The commissioned facility gives the Air Corps a self-contained, standards-compliant aviation fuel operation on the airfield.
Key Highlights
- Two 50,000-gallon aviation fuel storage tanks
- Fuel operations building construction
- Pump house design and construction
- Truck maintenance building with fuel offload point
- Fuel piping, pumps and controls installed and commissioned
Site Gallery




Related Projects
Need a similar project executed?
Get a Quote