PRJ-04 / POWER & BOILERS / PAKISTAN
Triplex Waste Heat Boiler & 20 TPH Steam Boiler Installation

Client
International Boilers & Pressure Vessel Ltd.
Location
Pakistan
Industry
Power & Boilers
Year
2020
Project Scope & Details
MHN Engineering delivered a high-capacity boiler package combining a triplex waste heat boiler with a 20 tons-per-hour steam boiler, sized to meet the heavy steam demand of a continuous production plant. The scope covered erection, piping and the structural framework that supports the boiler house.
A key part of the job was the replacement of the Basuki boiler bed tubes and the overhaul of the heat exchanger, restoring the unit to full rated output. Our welders carried out precision tube work and pressure testing before recommissioning.
The completed installation gives the client a dependable, high-output steam supply with improved thermal performance and reduced downtime.
Key Highlights
- Triplex waste heat boiler installed and integrated
- 20 TPH steam boiler erection and piping
- Basuki boiler bed tube replacement
- Heat exchanger overhaul and pressure testing
- Structural framework for the boiler house