BOPP Plant Chiller & Utility Piping Installation — Poly Pack (Pvt.) Ltd.

Brine chiller and utility piping installation at Poly Pack BOPP plant, Sheikhupura
Client
Poly Pack (Pvt.) Ltd.
Location
Sheikhupura, Pakistan
Industry
Power & Boilers
Year
2024 – Present

Project Scope & Details

MHN Engineering executed the complete chiller and utility installation for Poly Pack’s BOPP plant at Sheikhupura. The scope covered installation of brine chillers along with their full pipeline network, a cooling tower, and an oil heater serving the plant’s process and utility requirements.

The team also carried out power house works, thermal oil line installation, and the plant’s utility piping, including the chiller pump room and its associated pipelines. All lines were fabricated, routed and connected on site.

After testing and commissioning, the system was handed over as a reliable utility installation supporting continuous BOPP film production.

Key Highlights

  • Brine chiller installation with complete pipeline network
  • Cooling tower installation
  • Oil heater installation
  • Power house works and thermal oil line installation
  • Chiller pump room piping and full plant utility piping